Horrocks Highway Rehabilitation

Between Tarlee and Linwood
Client
Department for Infrastructure & Transport / Downer EDI Works Pty Ltd
Project Duration
8 months
Meet the team involved
About Us

This Project entails to reconstruct a total of 7.5km of Horrocks Hwy, divided into five distinct sites, providing granular pavement widenings, asphalt profiling and granular overlay, shoulder sealing, with new and upgraded table drainage, subsoil drains, culvert replacements or extensions, vegetation removal, earthworks, and safety barriers.

Our Role

  • Vegetation Removal / Clearing
  • Bulk Earthworks and Swale Drain/Table Drain Installation
  • Stormwater Drainage and Subsoil Supply/Installation
  • Engineered Pavement Widenings to Existing Pavements (McAdam Pavements)
  • In situ Pulverization cut to fill
  • Profiling cut to spoil
  • Granular Overlay to Pavement/Shoulders